top of page

Input Request: NFPA 14 Standpipe Systems

FPC will feature NFPA 14: Standpipe Systems as Installed by Fire Sprinkler Contractors in our September edition and we need your input.


Deadline: August 3, 2026 (Please contact us for extensions.)


We are interested in learning about any intriguing or unique applications. Articles should concentrate on the design, components, products, services, installation methods and procedures, as well as issues and challenges associated with Standpipe Systems.

sprinkler standpipe
Photo courtesy of Johnathan Carl, C.E.T. September 2023 edition.

Submissions should include advice, opinions, and analysis of facts related to these subjects. You may want to consider sending us an Installation Report, an Applications article, a How To piece, or a simple list of Do’s and Don’ts.


We prefer articles that are 800 words or less, that can include images with captions, and sidebars.


Please submit articles and photographs for consideration.

(Note: hi-res photos will be considered for use on the cover.)


All materials should be submitted by August 3, 2026; contact us for possible extensions.


At the very least, if you offer related products and services, please send us complete contact information and a brief product description.

 

If you have any questions or would like to discuss an article or this feature, please contact me.

 

Thank you very much,

 

Brant Brumbeloe, Editor

FPC magazine

(530) 823-0706



Your experience builds the industry. Let it be heard.

Comments


bottom of page